# Build and Interpret a Grazing Rotation Schedule

Source: https://help.ranchassist.com/rotational-grazing-planner/rotation-schedule

### Choose how graze days are determined

The planner can support equal days per paddock, capacity-based grazing days, a target rest-period approach, or a manual sequence. Choose the mode that matches the planning question.

### Sequence matters

The same paddocks can produce a different calendar when their order changes. Drag or reorder the sequence before relying on projected dates.

### Start date

The start date anchors the timeline. Each paddock's projected graze duration determines the next entry and exit date.

### Recovery target

Each paddock may have a user-defined recovery target. When the projected return occurs sooner than that target, RanchAssist should display a warning.

### What a warning means

The warning means the schedule conflicts with the user's entered target. It does not prove the paddock is biologically ready or unready; actual forage recovery requires field observation and appropriate local guidance.